Newly launched maps present proposed places and constructing heights for housing close to Melbourne’s busiest prepare and tram traces, because the state seeks group suggestions.
Victoria is looking on native communities to have their say on the most recent draft maps revealing proposed constructing heights and limits for brand spanking new houses throughout 23 areas which have been designated “prepare and tram zone exercise centres”.
These zones kind a part of a broader plan overlaying 50 exercise centres, that are anticipated to allow greater than 300,000 new houses shut to move, jobs and providers by 2051.
The state has launched draft plans for 23 prepare and tram zone exercise centres throughout Melbourne. Image: Getty
A few of the closing plans to be launched, these 23 zones are designed to ship extra housing alongside many of Melbourne’s busiest transport corridors, together with in Caulfield, Toorak, Armadale, Malvern, South Yarra, Prahran, Windsor, Blackburn and others.
In 2025, the state opened session on the primary 25 zones and has now launched maps for the ultimate 23. These additionally embody 4 smaller “neighbourhood centres”, geared toward planning for extra modest development.
The remaining two inner-Melbourne centres, which cowl the complete native authorities areas of Melbourne and Yarra, will undergo a separate session course of.
Victorian minister for planning Sonya Kilkenny stated the reforms have been designed to assist individuals stay nearer to public transport and on a regular basis facilities.
“Whether or not it’s making it simpler to construct houses near public transport, townhouses in our internal suburbs, or household houses with a yard – our planning reforms are all about giving extra Victorians actual housing selection,” Ms Kilkenny stated.
Throughout the centres, 5 are linked to the brand new Metro Tunnel, which opened in late 2025. Eight centres are situated alongside the Frankston line, together with one neighbourhood centre, whereas 4 sit alongside the Sandringham line and three are on the Belgrave and Lilydale traces.
In the meantime, two neighbourhood centres are situated alongside the Alamein prepare line, and one sits on the Route 58 tram line.
How the draft exercise centre zones work
As with the primary set of exercise centres, every draft map divides centres into two areas: a core and a catchment.
How the core and catchment sections will work throughout every exercise centre. Image: Have interaction Victoria
The core areas enable for extra houses in taller condo buildings, with proposed heights starting from six storeys to as much as 20 storeys in some places.
Catchments encompass the core inside every exercise centre and suggest decrease top limits, with a concentrate on low-rise flats and townhouses.
Internal catchments, sometimes inside a five-minute stroll of the station or centre, suggest top limits of 4 storeys, or as much as six storeys on bigger blocks of greater than 1000 sq. metres.
Outer catchments, typically inside a ten-minute stroll, suggest top limits of three storeys, or as much as 4 storeys on blocks bigger than 1000 sq. metres.
The draft maps at the moment are open for group session all through February and March, with residents invited to supply suggestions on constructing heights, setbacks and limits.
Through the first spherical of session, greater than 1000 individuals attended in-person or on-line periods, and greater than 3000 submissions have been acquired.
Extra data on the draft maps is obtainable on the Victorian authorities’s web site.
Are you interested by studying extra about shopping for and constructing new? Discover our New Properties part.

